• millikin football field rendering

    Turf Project

  • Student-athletes are at the heart of Βι¶ΉΤΌΕΔ University’s story. Over 40% of our undergraduates compete in Big Blue Athletics, bringing energy, teamwork and pride to our campus every day.

    Their dedication drives our success and fuels our ambition. Playing in the College Conference of Illinois & Wisconsin (CCIW) — one of the nation’s premier NCAA Division III conferences — demands excellence both on and off the field and calls for facilities that match the passion and potential of our student-athletes. By supporting the Turf Project, you’re helping maintain a space that reflects our Big Blue spirit, acknowledges our commitment and strengthens the future of Athletics.

    Our student-athletes give their all every day. Let’s give them a field that matches their commitment. Invest in the Turf Project and help shape the next chapter of Big Blue excellence.

  • Frank M. Lindsay Field is a cornerstone of Βι¶ΉΤΌΕΔ University Athletics, where our teams train, compete and create lasting memories. It is also greatly in need of updates to ensure the safety of our student-athletes, to remain competitive CCIW conference members, and to showcase attractive programs necessary for student recruitment and retention. The Turf Project will transform Frank M. Lindsay Field into a state-of-the-art, safe and durable turf field designed to support student-athletes. The upgraded turf will reduce injury risks associated with worn surfaces, improve field conditions for consistent play, and allow student-athletes to practice and compete without compromising safety or performance.

    Turf Project Details

    The new playing surface at Frank M. Lindsay Field will feature the following:

    • Pivot 120 turf by TenCate, designed without performance infill, combining traction and stability with softness, durability, playability and minimal maintenance needs.
    • GeoFlo dynamic shock padding, featuring patented technology that conducts moisture and absorbs energy, addressing ground inefficiencies and prioritizing player safety while reducing adverse environmental impact.
    • GeoCool alternative cooling system technology, which reduces surface temperature, resulting in better ball handling and superior athletic performance.

    Phase 1 Project Investment: $1.5M

    Goal to raise $495,000 by Dec. 31, 2026

  • Workman Family Baseball Field is a premier NCAA DIII, CCIW, and summer Prospect League facility. This field matches the commitment to excellence that Βι¶ΉΤΌΕΔ strives for supporting its students.

    Turf Project Details

    The new playing surface at Workman Family Baseball Field will feature the following:

    AstroTurf Diamond series/RootZone Diamond Blend:

    • Legend-shaped polyethylene monofilament fibers for good durability, pristine appearance, and exceptionally durable slit film fibers for resistance to wear.
    • RootZone, a texturized fiber system that curls down and acts like a net to encapsulate the infill, reducing its migration.
    • RootZone creates less interference from infill splash as the ball hits the surface, giving more realistic hops.
    • Infill mix is specifically formulated to replicate grass.

    Phase 2 Project Investment: $300,000

    Βι¶ΉΤΌΕΔ Baseball is a Championship Program

    • Coach Brandon Townsend enters his 14th season (281-235)
    • Winningest Baseball Coach in Βι¶ΉΤΌΕΔ’s history
    • CCIW Coach of the Year 2019, 2024, 2026
    • Team won two CCIW regular season titles: 2024, 2026
    • Team won three CCIW Conference Tournament titles: 2021, 2024, 2026
    • Team hosted two NCAA Regionals: 2021, 2026